Functionality statement executed by the engineer, architect, electrician, or licensed fire alarm vendorĪt Banksia, we assist our clients by reviewing the as-builts to verify all information complies before the final FDNY inspection.PW1 number with affixed barcode or tm-1 number.Name, address owner and occupant information.Must include a title block with the following information.As-built drawings must be formatted and printed on 11×17.The as-built drawings should include the following: What should be included in the as-built drawings?Īs-built drawings need to comply with several codes, rules, and bulletins, as follows: BC 907.18, FC 907.19, 3RCNY S105-01 and FDNY Technology Management Bulletin. As-built drawings keep a record of what is installed allowing the fire alarm company to reference when making repairs. Additionally, it is a requirement to keep your up to date as-built drawings at the fire command center. The FDNY inspect will verify the accuracy of the as-built drawings during their inspection. Fire alarm as-built drawings are an important piece of acquiring your Letter of Approval from the FDNY.įDNY requires an as-built riser diagram to be submitted as part of your request for inspection.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |